Responsive Navbar

Gypsum and Ceiling Installers

Job Description

Roles & Responsibilities

Role Purpose

Install gypsum board ceilings/bulkheads, suspended (T-grid) ceilings, and related framing, insulation, and access panels per approved drawings, specifications, and authority requirements, achieving required quality/tolerances and coordinating with services above ceiling—while accounting for Sharjah weather and traffic/logistics constraints.


Key Responsibilities

1) Planning & Preparation

  • Read IFC/shop drawings, ceiling layouts, levels, bulkhead details, access panel schedule, and coordination drawings with MEP.

  • Verify substrate readiness (embed channels/inserts, soffit condition, marked services, firestopping requirements).

  • Set out ceiling grid/gypsum framing using laser levels and control lines; mark cut-outs for diffusers, lights, sprinklers, and hatches.

  • Check materials against approvals (board type: regular/MR/FR; insulation density; channels/hangers; fixings).

2) Installation (Gypsum & Suspended Ceilings)

  • Fix hangers/anchors to slab or structural members at specified spacing; install main and furring channels and perimeter angles with level control.

  • Build bulkheads, pelmets, light troughs, coffers, and feature edges to shop details; ensure straight arrises and radii as required.

  • Install gypsum boards with correct screw spacing, joint staggering, and expansion joints; fit T-grid tiles (mineral fiber/metal) true to line and level.

  • Provide and align access panels for MEP/FA/FF maintenance per schedule; ensure removable tiles near equipment.

  • Place acoustic/thermal insulation where specified; maintain fire-rating continuity (FR boards, sealants, backing strips).

  • Form accurate openings for downlights, linear lights, diffusers, sprinklers, detectors; reinforce edges as detailed.

3) Finishing & Protection

  • Treat joints (tapes/compounds), internal/external corners (beads), control cracks by correct jointing sequence and curing; sand to paint-ready finish.

  • Protect finished ceilings from moisture, dust, and impact; maintain plenum cleanliness before close-up.

4) Quality, Inspections & Documentation

  • Adhere to method statements and ITPs; present work for MIR/WIR inspections.

  • Meet tolerances for level/flatness, alignment, joint visibility, and edge gaps around services.

  • Ensure fire/acoustic performance is not compromised at penetrations; coordinate with QA/QC for inspection records and redlines.

5) HSE

  • Comply with working-at-height controls (scaffolds/MEWPs), edge protection, tool lanyards.

  • Control silica/gypsum dust (cutting with extraction, masks/respirators); manage manual handling for boards.

  • Lock-out/tag-out near live electrical works; maintain housekeeping and safe access routes.

6) Authorities & Coordination

  • Installations to align with Sharjah Municipality approvals and Sharjah Civil Defense requirements where ceilings are part of fire compartments or escape routes (FR ratings, signage/visibility, firestopping at penetrations).

  • Coordinate MEP first/second fix completion and testing prior to ceiling close-up; ensure access panel locations match O&M needs.


Weather & Traffic Considerations (Sharjah/UAE)

  • Heat & Humidity:

    • Store boards flat in shaded, ventilated, dry areas; acclimatize before installation to reduce warping.

    • Schedule jointing/compound works during cooler hours; extend drying/curing times; avoid rapid forced drying that causes cracks.

    • Observe MOHRE summer midday break; provide hydration and shaded rest areas.

  • Dust/Sand:

    • Protect boards and plenum from dust; cover open ductwork; clean surfaces before jointing and painting.

  • Occasional Rain/Coastal Effects:

    • Prevent moisture exposure during transport/handling; use MR/FR-MR boards in wet rooms as specified; protect steel components from corrosion.

  • Traffic & Logistics:

    • Plan off-peak deliveries for long boards and channels; use banksmen for off-loading; stage materials close to work fronts without overloading slabs or blocking egress.


Qualifications & Experience

  • 3–6 years ceiling/gypsum installation experience (UAE/GCC preferred) on low/mid-rise RC buildings.

  • Able to read shop drawings/levels and follow setting-out marks.

  • Skilled in metal framing, board fixing, joint treatment, T-grid installation, insulation placement, and access panel fitting.

  • Familiar with fire-rated and moisture-resistant systems and coordination around MEP/FA/FF.


Tools & Equipment (Typical)

Laser level, measuring tape, chalk line, drills/drivers, board lifter, aviation snips, saw/cutters with dust extraction, spatulas/taping knives, sanding tools, scaffolds/MEWPs, PPE (helmet, gloves, boots, goggles, respirator).


Core Competencies

  • Accuracy of level/line and neat workmanship

  • Coordination with services and other finishes

  • Productivity and time management

  • Safety awareness and housekeeping

  • Material care and defect prevention (joint cracking, sagging)


KPIs

  • First-time pass rate on WIRs; minimal rework/snags.

  • Ceiling levelness/flatness within tolerance; clean, invisible joints post-paint.

  • Joint crack rate within target during DLP; correct access panel locations 100%.

  • Productivity (m²/day) achieved vs. target; adherence to programme.

  • Zero lost-time incidents; compliance with midday break and site traffic plan.

Job Detail
  • Work Type: Full Time
  • Languages to be known : English, Hindi
  • Country: United Arab Emirates
  • City: Dubai
  • Job Category : Construction and Building Maintenance