Responsive Navbar

Ceramic and Flooring Installer

Job Description

Roles & Responsibilities

Role Purpose

Engineer, supply, install, finish, protect, and hand over ceramic/porcelain tiles and other floor finishes to specification—achieving the required flatness, falls, slip resistance, and durability—while complying with Sharjah Municipality requirements and factoring weather and traffic/logistics constraints.

Typical Scope for Category-3 (G+3)

  • Floor & wall tiling: ceramic/porcelain/vitrified tiles, mosaics, skirting, stair treads/risers, thresholds.

  • External areas: balcony/terrace tiles or pavers, stair/landing nosings, anti-slip treatments.

  • Other finishes (as included in contract): LVT/SPC, vinyl sheet, laminate/engineered wood, carpet tiles, self-levelling/underlayment, screeds.

  • Accessories: trims/edge profiles, expansion & movement joints, acoustic/uncoupling membranes, sealers, grouts (cementitious/epoxy).


Key Responsibilities

 Engineering, Submittals & Approvals

  • Prepare shop drawings/layouts: set-out, patterns, cuts at perimeters, movement-joint plan, stair details, thresholds, balcony drip edges.

  • Provide samples/mock-ups and material data sheets (tile calibre/tonality, adhesives, grouts, trims, sealers).

  • Demonstrate slip-resistance suitability for wet areas and external zones (e.g., textured tiles/anti-slip nosings) as per project specs.

  • Coordinate with Waterproofing/MEP for drains, falls, and penetrations; raise RFIs for conflicts.

Substrate Assessment & Preparation

  • Verify substrate flatness/levelness with 2 m straightedge; rectify with screed or self-levelling as specified.

  • Check moisture content; ensure curing of screeds; apply primers/bonding agents where required.

  • Protect and confirm waterproofing completion (flood test pass) before tiling in wet areas; install uncoupling/acoustic membranes where specified.

Installation — Tiles & Mosaics

  • Set out from datum lines; dry-lay to control cuts/shade; maintain joint width per spec.

  • Use approved adhesives (latex-modified/rapid-set/epoxy as required); ensure ≥80% coverage on walls and ≥95% on floors/wet/external areas (back-buttering large format).

  • Control lippage within tolerance (use leveling systems where specified); align skirting, trims, and reveals.

  • Form movement joints at perimeters/fields/thresholds; respect structural joints with elastomeric sealants and profiles.

  • Create falls (typically 1–2%) to drains in wet rooms and balconies; form stair nosing details and anti-slip strips.

 Installation — Resilient/LVT/SPC/Laminate/Carpet (if in scope)

  • Acclimatize materials; prepare smooth, dry subfloors; install vapour barriers if required.

  • Apply adhesives per data sheet; maintain perimeter expansion gaps; fit transitions to adjacent finishes.

  • For carpet tiles, coordinate grid/pile direction and edge restraints.

 Finishing, Cleaning & Protection

  • Grout with approved cementitious/epoxy grout; clean grout haze promptly; apply sealers on porous tiles/stone if specified.

  • Protect finished areas (cardboard/hardboard + polythene, edge guards); set no-traffic periods and lift/equipment routing to avoid damage.

QA/QC, Inspections & Documentation

  • Follow method statements/ITPs; present work for MIR/WIR inspections.

  • Check tolerances: flatness, joint uniformity, lippage, falls to drain, stair geometry, slip-resistance requirements.

  • Maintain records: area tallies, batch/lot numbers, adhesive/grout batches, mock-up approvals, snag lists & closures; submit as-built layouts and O&M/cleaning guidance.

HSE

  • Control silica/ceramic dust (wet cutting/extraction, RPE), noise, and sharp-edge handling; guards on cutters.

  • Manage manual handling for large-format tiles; use lifters/frames.

  • Safe work at height on balconies/stairs; housekeeping to prevent slips/trips; electrical LOTO for powered tools.

 Programme & Logistics

  • Sequence after block/plaster/mechanical first fix and waterproofing; coordinate with doors/joinery and glazing to protect thresholds.

  • Plan deliveries/staging to avoid overloading slabs; keep egress and inspection routes clear; align curing windows with programme.


Weather & Traffic Considerations (Sharjah/UAE)

  • Heat & Humidity:

    • Schedule adhesive/grout works early morning/evening; comply with MOHRE summer midday break.

    • Store tiles/adhesives in shade/ventilation; acclimatize LVT/SPC/laminate; cool mixing water if recommended.

    • Expect extended curing; avoid direct sun on fresh adhesive/grout; protect balconies/terraces from rapid drying and thermal shock.

  • Dust/Sand:

    • Cover materials; clean bonding faces immediately before fixing; use dust suppression when cutting; protect MEP/ducts and adjacent finishes.

  • Occasional Rain/Coastal Effects:

    • Do not install over wet/saturated substrates; cover external areas; verify balcony drip edges/weep paths; use corrosion-resistant trims/fixings where specified.

  • Traffic & Logistics:

    • Plan off-peak deliveries of tiles/pallets; use banksmen for off-loading; coordinate SRTA/Police permits if roadside access is affected.

    • Stage close to work fronts without blocking exits or overloading slabs; enforce traffic restrictions on newly laid floors.


Qualifications & Experience

  • Licensed/approved flooring contractor with UAE references.

  • 7–10+ years tiling/flooring installation on low/mid-rise RC buildings (including wet rooms and balconies).

  • Skilled with large-format tiles, epoxy grout, movement-joint detailing, screeds/levelling, and anti-slip solutions.

  • Able to read drawings/levels and meet tolerance/finish requirements.

  • English for coordination; Arabic/Urdu/Hindi an advantage. Valid UAE driving license preferred.


Tools & Equipment (Typical)

Tile saws with water feed/extraction, mixers, notched trowels, leveling systems/spacers, suction lifters, grinders (with extraction), straightedges/laser levels, rollers (LVT), hand tools, PPE (gloves, boots, goggles, hearing protection, respirators).


Core Competencies

  • Precise setting-out and tolerance control

  • Lippage and joint uniformity management

  • Durable wet-area/external detailing (falls, joints, sealants)

  • Protection/housekeeping and cross-trade coordination

  • Safety-first mindset under heat and dust


KPIs

  • First-time pass on WIRs; flatness/lippage/falls within spec.

  • Low snag/rework rate and minimal DLP call-backs (cracks, hollow tiles, debonding).

  • Programme adherence for rooms/balconies; no damage to completed areas.

  • Compliance with midday break and site traffic plan; zero lost-time incidents.

  • Complete as-builts/O&M accepted on first submission.

Job Detail
  • Work Type: Full Time
  • Languages to be known : English, Hindi
  • Country: United Arab Emirates
  • City: Dubai
  • Job Category : Construction and Building Maintenance